Galveston, Texas

Our relationship with Galveston dates back to the first Headworks screen installation in 2003. Prior to Headworks equipment, the pumps upstream from the screens would become "ragged up" with rubbish and break down on a regular basis. "Shutdown maintenance on these pumps was necessary every 2 to 4 weeks, which was extremely costly in both time and money", according to Galveston Plant Operations Manager Dennis Zajack.

Since the installations of the Headworks Bar Screens, the pump maintenance has been drastically reduced from its previous cycle of every 2 to 4 weeks.  "Maintenance due to pump blockages is now necessary on average since the Headworks screen installation only once a year!" (D. Zajack, City of Galveston).

 